Infrastructure and Utility  
Unit 1- Deewanganj (54000 MT)

Unit 1 of APIB Pvt.Ltd. is located in fully developed industrial area at Deewanganj,MP with all resources facility. This plant get the Raw Material Single Super Phosphate (SSP) from MBPL Unit 1 and convert it to the final product Granualated Single Super Phosphate (GSSP). Unit 1 at Deewanganj having installed capacity of 54,000 MT.

Unit 2- Meghnagar (60000 MT)

Unit 2 of APIB Pvt.Ltd. is located in fully developed industrial area at Meghnagar, Jhabua MP with all resources facility. This plant get the Raw Material Low Grade Rocks from mines for benification of Rock Phosphate and after conversion the final product Beneficiated Rock Phosphate (BRP). Unit 2 at Meghnagar having installed capacity of 60,000 MT.

Infrastructure facilities including resources:

Water :The Water requirement for the project shall be met out from own tube wells and from AKVN. The required water is available from these sources throughout the year. The total water requirement is estimated to be 614 cmd out of which 430 cmd will be recycled back into beneficiation process. The fresh water requirement of 184 cmd for the proposed plant including domestic requirement will be met through AKVN borewell supply within the premises.

Power : Internal consumption of power plant will be available in the area through 1500 KVA that will supply by the M P State Electricity Board. Two nos. DG set of 750 KVA shall also be installed for power supply as alternative arrangement.

Transport : The project site is well connected with road transport. All modern telecommunication facilities are available on the site. Nearest Railway Station is Meghenagar – 2 km & nearest airport is DABH Airport, Indore - 155 km. Parking provision of 44 ECS has been taken into consideration for the proposed plant.

Manpower : 35 Staff + 46 Labours for 24 working hours are proposed.